adequately wet

adjectiveConstruction

Of asbestos: made wet for safety reasons, in order to prevent the escape of harmful particles, for example during demolition.

ag

Clipping of aggregate (“small rocks mixed into concrete”).

aged R-value

thermal resistance value established by using artificial conditioning procedures for a prescribed period of time.

aggregate

Crushed stone, crushed slag or water-worn gravel used for surfacing a built-up roof system.

air drain

An ample space left at the foot of foundation walls for the sake of dryness.

air-blown asphalt

Asphalt produced by blowing air through molten asphalt to raise its softening point and modify other properties.

alligatoring

The cracking of the surfacing bitumen on a bituminous roof or coating on a SPF roof, producing a pattern of cracks similar to an alligator's hide.

apron flashing

A flashing located at the juncture of the top of a sloped roof and a vertical wall, chimney or steeper-sloped roof.

architectural concrete

Concrete that is exposed to view because it forms part of a surface, and may therefore need special attention given to its appearance.

architectural panel

A metal roof panel, typically a double standing seam or batten seam; usually requires solid decking underneath and relies of slope to shed water

as-built

A drawing showing how a project was actually built as opposed to how it was intended to be built.

barrel vault

A building profile featuring a rounded profile to the roof on the short axis, but with no angle change on a cut along the long axis.

barrier board

noncombustible board stock material of low thermal conductivity placed between two elements of a roof assembly.

base cap

A decorative molding that is applied on top of a baseboard molding to create a layered trim and finished look.

base sheet

an impregnated, saturated, or coated felt placed as the first ply in some low-slope roof systems.

battening

Synonym of batten (“strip of wood used to hold things together or provide a fixing point”).

batter rule

An instrument consisting of a (normally wooden) rule or frame, and a plumb line, by which the batter (slope) of a wall is regulated.

BCM

Initialism of bank cubic meter, a measure of the original volume of excavated material as it was in the ground, prior to removal.

Bermuda seam

a metal panel profile featuring a step-down profile that runs perpendicular to the slope of the roof.

blister

An enclosed pocket of air, which may be mixed with water or solvent vapor, trapped between impermeable layers of felt or between the membrane and substrate.

blockout

A void that is deliberately not filled with concrete, so that it can be used to insert something else such as pipework.

bluetop

A stake or other marker set into the subgrade to indicate the desired grade elevation.

bond

In building, a specific pattern of bricklaying, based on overlapping rows or layers to give strength.

bond timber

A wooden beam integrated into masonry walls in order to strengthen the structure by tying sections together longitudinally.

borrow pit

A pit that is dug to extract material (such as soil, gravel, or sand) for use at another location.

bottle house

A structure, often a folk art construction or an eco-friendly dwelling, built primarily using glass or plastic bottles bound together with mortar or other materials.

breakthrough

The penetration of a separating wall or the remaining distance to an adjacent hollow (a crosscut in mining) or between two parts of a tunnel build from both ends.

breast down

verbConstructiondated

To use a process of sequential drilling and blasting in building tunnels for mining, subways, etc.

broom

To improve the embedding of a membrane by using a broom or squeegee to smooth it out and ensure contact with the adhesive under the membrane.

browning

A smooth coat of brown mortar, usually the second coat, and the preparation for the finishing coat of plaster.

builder's remedy

A legal mechanism in the United States where, if a municipality fails to comply with state laws regarding the development of new housing, a developer can bypass or ignore certain zoning laws and begin construction in an expedited manner, or can use other legal remedies.

building site

The site, the place where a building is located, is currently under construction, or shall be constructed (including structures other than buildings).

built-up roof

A continuous, semi-flexible roof membrane, consisting of multiple plies of saturated felts, coated felts, fabrics or mats assembled in place with alternate layers of bitumen, and surfaced with mineral aggregate, bituminous materials, a liquid-applied coating or a granule-surfaced cap sheet.

bulb tee

A T-beam with a web (vertical section) thickened into a bulbous part at its lower edge.

butment

The mass of stone or solid work at the end of a bridge, by which the extreme arches are sustained, or by which the end of a bridge without arches is supported.

cant strip

a beveled strip used under flashings to modify the angle at the point where the roofing or waterproofing membrane meets any vertical element.

cantilever

A beam anchored at one end and projecting into space, such as a long bracket projecting from a wall to support a balcony.

cap sheet

A sheet, often granule-surfaced, used as the top ply of some roof membranes and/or flashings.

caulk

To apply caulking to joints, cracks, or a juncture of different materials.

chimney flashing

A strip of material around the base of a chimney, traditionally lead and sometimes including a short length of flue, that prevents rainwater from entering a building.

cladding